Overall stats are the following:
- Contrib issues fixed: 49 + 4 in progress
- Drupal 8 core issues fixed: 3 + 10 in progress
- Created 6 contrib module releases: Date, Gmap. Location, Faq, Advanced_forum, Cerf
- Drupal core strings translated to Ukrainian: ~1000 (7 translators participated)
- Github D7 repo PR count: 37 fixed /6 in progress
- Github D8 repo PR count: 11 closed / 3 in progress
- One contrib module porting to D8 started - https://www.drupal.org/node/2228373.
- The work was finished on December 25th (https://www.drupal.org/node/2396933).
During this period, we committed more than 100 tasks to the Drupal 8 core.
DrupalNight 2012 concept presentation
This code sprint brought Twig into Drupal 8 core.
Thanks to this and the next one, we essentially added Twig to the Drupal 8 core, for which we were dubbed #crazy_ukrainians
The announcement of the first Ukrainian Drupal Code Sprint.